
Borewell Development & Installation
Proper development is what turns a drilled hole into an efficient, long-lasting well. We develop, clean and prepare borewells so that they deliver silt-free discharge and perform to their potential.
The company is equipped with compressors from 450 to 1,100 CFM and 150 to 600 PSI for development of tube wells. A 550 CFM @ 600 PSI compressor enables quick and effective development of tube wells up to 1,500 ft deep by direct lowering of the air line, and a screw air compressor of 1,100 CFM @ 350 PSI has been added to the fleet. Tube wells are further developed with submersible pumps to make the discharge silt-free.
See development in action
Borewell development and yield discharge at a Hitech Drilling Engineers project site. High-pressure air and pump development clears fines from the formation until the discharge runs clean.
Development & installation services
- Air-lift development with high-pressure compressors
- Development with submersible pumps for silt-free water
- Desilting & cleaning of damaged / old borewells
- Rejuvenation of low-yield borewells
- Casing, slotted pipe and screen installation
- Gravel packing and sanitary sealing
- Step draw-down test after development
- Pump selection, lowering and commissioning
We also have expertise in desilting and cleaning damaged borewells and earth pits, and in installation of submersible, jet and hand pumps – keeping the customer's preference and site conditions at the centre of every recommendation.







